CONTAINMENT
CRACK REPAIR
PROJECT
CASE HISTORY 1994 - 1997
Dow Chemical Company
Midland, Michigan
Containment Dike Cleaning and Crack Repair
Project
Dow Chemical has
many containment areas around the various
chemical tanks, loading and mixing areas, these
containment areas are referred to as "Dikes." ReNew® Systems was hired to clean
these dikes and repair any concrete surface
cracks to prevent possible contamination.
Cleaning
Apply Shocon
emulsifier, power wash with 3000 psi. Brush Blast
any noticeable cracks (4) inches each side of
crack. If crack opens as blasting, utilize a
crack chaser to open crack beyond failure and
fill with proper joint compound.
Preparation
of Cracks
- Brush blast
crack or chase crack as mentioned above.
- Apply
concrete primer to blasted surface
leaving 1" on each side of blasting
line not primed.
- Apply 45-60
mils of ReNew Flex® Spray 4-6"
wide, taking care not to coat beyond
primer to help prevent failure.
Result
Dikes are cleaned
of contaminants, cracks are repaired to prevent
leakage and possible ground contamination. Over (2)
miles coated to date!
|