Environmental Design Solutions

 
 

NuSystems, Inc.

   
ReNew Systems, Inc.
 

Contact Us

PO Box 1072
Bay City, MI 48706

1-800-722-2641
(989) 892-4552
Fax: (989) 892-3722

FLOOR COATING PROCEDURE POLY PRO (TM) POLYUREA

Floors

Preparation 

A properly prepared surface is 95% of the success of even the best coating. Please consult your ReNew® representative for proper preparation of your surface. 

Primer 

Apply 2-4 mils of specified ReNew® Primer to surface, allow a minimum of 15 minutes to cure. Apply by rollers and detail with brush. Follow all directions and MSDS information. 

Coating

Apply 6-8 mils of PolyArmor Pro (TM) topcoat to primed surface. Be sure to patiently work the product into the primed surface, this may require 2-3 passes. If anti-skid surface is desired, add to desired saturation after you rework the first coat. Allow to cure for 2-3 hours. Lock down coat for anti-skid system should be now applied at 4-6 mils coverage and allowed to cure for (8) hours minimum. 

This product can be spray, brush and roller applied. The above system utilizes the roller and brush applications. 

  Back

Return to System Applications

Next
Revised 9/16/08
Trademark and Servicemark of NuSystems™, Inc.
©2008 NuSystems™, Inc. All Rights Reserved
Patents Pending